banner
Home / Blog / Vietsovpetro successfully installs wellhead platform topside at Bach Ho oil field | Vietnam+ (VietnamPlus)
Blog

Vietsovpetro successfully installs wellhead platform topside at Bach Ho oil field | Vietnam+ (VietnamPlus)

Oct 29, 2024Oct 29, 2024

Chairman of the Board of Directors of the Vietnam Oil and Gas Group (Petrovietnam) Le Manh Hung has stressed the necessity to prevent any difficulties from impacting the progress of the Block B gas – electricity project chain as it is the most critical project of the group from now to 2030 and is drawing significant public interest.